Troy Dirt Project: Spectrum Bvld.
Spectrum Blvd. Project
Spectrum Blvd. Project phase 4 and 5 Completed end of 2016 approx 20,000 yards of material exported by Troy Dirt over the course of several weeks always having boots on the ground each day hauling to multiple dumpsites in San Diego helped to keep things moving forward in a timely fashion. Sometimes it boils down to having to utilize more than one import location based on just how much dirt is actually involved with these larger jobs. Thanks to do diligence and a large network of resources this job was completed on schedule and budget!